Newsletter


6th workshop in the CP-2009-1 project

6th workshop in the CP-2009-1 project

In the frame of the Cleaner Production 2009-1 project, representatives of companies presented identified CP options after 7-month work. Over 100 CP options were identified, ranging from no-cost-low-cost to high cost measures. Most of the options are in energy savings, than in water and than in raw materials. Average economical annual savings per company is about 100,000 EUR, with payback period slightly more than one year.
Complete results will be published in Final report, which will be presented to the public during award ceremony, scheduled for November 19, 2009 in the Serbian Chamber of Commerce, Terazije 23, 2nd floor. Award ceremony begins at 11 am.

Photos from the workshop can be seen and downloaded here:

WS6 05102009

10.05.2009. - Readings: 200 Comments: 0 - rss | print

Add comment